El Paso, TX

IBWC Install High Lighting

End User: IBWC

Contract Number: 191BWC22C0005

Time Frame: 30 AUG 2022 – 01 JUNE 2023

Value: $1,030,656.43

Scope of work:

Provide the labor and material to install 4 new high mast lighting, testing of current soil conditions, getting geotechnical results, basing structural foundations off findings, providing engineer stamped electrical/structural designs to client for approval, demonstrating pathways to be taken, get with electric company for new service, communicate how area may be affected by ongoing construction, remove fencing on light across dam, install concrete foundations, trench pathways, laydown underground conduit, horizontally assemble poles, erect poles with 200’ crane, install LED lights on pole, run wire to newly installed electrical panels, test lights/lowering capabilities, train IBWC staff, and finally closeout project with all required documentation.